Former AVX Manufacturing Site

Project Info
  • Construction Date: July 2019 to October 2020
  • Location: New Bedford, MA
  • Category: Soil Remediation
Project Details

In June 2019 NSI constructed over a 25x50x30feet cofferdam as a test cell for chemical remediation. While a relatively small cofferdam the design required several mobilizations to remove and re-configure the structure to facilitate the remedial design. The installation is designed to remove low level PCB concentrations dissolved in groundwater passing through the cell.

More Project Details

Enter your keyword